Packaging
Case packer running short of rate
The line had never reached nameplate since installation. We remodelled the infeed geometry, machined four guide sets and retimed the PLC sequence around the real cycle rather than the design cycle.
- Scope
- Design, machining, controls
- On site
- 2 shifts
- Result
- +11% rate